Quote:
Originally Posted by roundel335 View Post
How much longer until the MPPK-compatible version is available?
The goal is to have it available in the next 60 days. What the actual timetable is, is yet to be determined. Perhaps everything goes smoothly and very little tweaking is needed and it will be available in 30 days or the complete opposite could happen and a major snag/problem occurs and that 60 days turns into 90 days. Sorry about the vague response but the engineering side of the building has always been a fickle bunch and the engineer credo of "it's done when it's done" doesn't lend itself to hard dates.